Laserfiche WebLink
<br />EXHIBIT E <br />RECLAMATION PLAN <br />SOUTH FRUITA GRAVEL PIT <br />_` <br />7 <br />z <br />c <br />Since the gra 1 pits are located adjacent to th Colorado River, <br />when the mining operation is completed the exca ated areas will <br />fill up with wat The water level will be proximately equal <br />to that of the Col rado River. <br />Phases I, II and III~iII have surface ar,~as of 29, 4 and 8 acres <br />respectively. \ <br />Reclamation of the grave pit areas <br />sides of the pit 3 horizon al to 1- <br />surface to 10 feet below th high <br />to 1 vertical to the bottom o th <br />on the slopes above the water e <br />The slopes of the pit will be <br />by the Soil Conservation Serv ce, <br />be broadcast in the Fa 11 of he ve <br />11 consist of sloping the <br />erticai from the existing ground <br />ater level and then 2 horizontal <br />pit. Topsoil will be spread <br />to a depth of 4 to 6 inches. <br />ed with the seed mixture recommended <br />(See Exhibit J.) The seed will <br />• Two small islands will be constructed in Phase I area, approximately <br />" 1/4 acre in size. An ar a of approxima ely 350 feet in length will <br />be constructed with 5 1 slopes in Pha e I area. These are in <br />accordance with the r uest of the Divisio of Wildlife. <br />The intended use o~hase I pond is for water{owl. The owner has <br />no definite plans or the other two areas. \ <br />Reclamation will.`be done in phases, as an area is ompleted. The <br />time required to complete the reclamation will be ap roximately <br />two years after mining is completed, <br />