Laserfiche WebLink
SPOIL SPRING MONITORING <br />• A spoil spring monitoring program was initiated in 1986 and has <br />been conducted annually. According to the approved plan, the <br />annual mine wide survey is conducted during May and springs are <br />measured for flow and field parameters. If a spring is discharging <br />35 gallons per minute or greater then it will be monitored <br />throughout the remainder of the year in accordance with the <br />monitoring plan. No spoil springs were found in 1992 which <br />produced flow sufficient to measure and/or sample. <br />Water Quality <br />Since 1986 the maximum total spoil spring discharge was 0.040 cfs. <br />No measurable spoil spring flow was detected in 1992. Due to the <br />low to nonexistent flows, the spoil springs are not significant to <br />the hydrologic regime. <br />\_J <br />• Page 7 <br />