My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP28646
DRMS
>
Back File Migration
>
Report
>
REP28646
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:59:15 PM
Creation date
11/27/2007 5:07:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Report
Doc Date
4/30/1993
Doc Name
1993 Annual Hydrology Report
Annual Report Year
1993
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hydrologic Dam lnrerprrrarion and <br />less than one day for all ponds except MB-5. Pond <br />MB-5 is responsive [o a high spring groundwater <br />table and sometimes has to be dewatered more <br />often. <br />• <br />• <br />Ponds MB-3 and MB-4 did not discharge during <br />1992 and records indicate they have not discharged <br />since they were constructed. MB-t sometimes <br />catches hydraulic oil washdown from the Unit <br />Train Loadout. When this occurs, sorben[ materi- <br />als are placed in the pond to capture the oil <br />product. If a "major" hydraulic oil release enters <br />the pond, the pond is pumped by a licensed con- <br />tract hauler or the MCC vacuum truck. The <br />pumped oil is deposited in the shop waste oil tank <br />which is in turn pumped by a licensed waste oil <br />recycling firm. No spills requiring pond pumping <br />occurred during 1992. <br />Flowmeters are installed on discharge points from <br />sediment ponds which discharge intermittently to <br />continuously record (lows. Information on flows, <br />sampling points, and quality of water discharged <br />from [he mine site sediment ponds during 1992 is <br />included in Appendix J. All water discharged from <br />the ponds was in compliance with NPDES permit <br />effluent limitations. During spring runoff condi- <br />tions, as well as some precipitation events, quality <br />of water in the North Fork of the Gunnison is <br />much worse than the quality of discharges from <br />MCC sediment ponds. It is also well outside <br />NPDES effluent limitations. During winter base- <br />flow and summer conditions water quality in the <br />North Fork is better and is within NPDES effluent <br />limitations. However, this is the time of year when <br />MCC's ponds are rarely discharged. <br />Assessment for rhr Permit and Adjacersr Areas <br />Flow volumes from MCC sediment ponds are low <br />relative to the North Fork of the Gunnison flows. <br />Even during low flow conditions on the North <br />Fork MCC discharges represent an imperceptible <br />difference in stream quality. <br />Based on the analyses, sediment pond discharges <br />have had no adverse impact on the North Fork of <br />the Gunnison River. The quality of discharges <br />usually exceeds the quality of the North Fork. In <br />addition, pond discharge flows are so small the[ <br />incremental changes in concentrations in the North <br />Fork are imperceptible. <br />Discharges of surface runoff in 1993 are expected <br />to be similar to 1992. <br />Adequacy of Monitoring <br />Program <br />An evaluation of [he adequacy of [he current <br />monitoring plan was conducted to determine <br />whether the program is covering anticipated <br />affects. The mine workings map (Figure 2) was <br />overlaid on the resources maps to determine the <br />potential resources which may be affected. <br />Although several are above the mined area and• <br />adjacent to the mined area, overburden depths are <br />great enough (more than 350 feet) so that no~ <br />impacts are anticipated. LAs a result, no additional <br />monitoring activities are proposed. This is the <br />same determination for the 1990 and 1991 AHRs. <br />The only addition to the 1993 monitoring plan will <br />be spring CR-12. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.