My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP28608
DRMS
>
Back File Migration
>
Report
>
REP28608
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:59:13 PM
Creation date
11/27/2007 5:07:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989052
IBM Index Class Name
Report
Doc Date
10/25/1993
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 1102 ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.; • ~ III IIIIIIIIIIIIIIII • ~,_,, ,_ <br />;. <br />- , <br />Notice of. In tent to Continue Mining Operations OC T <br />110(2) Annual Report 2S 199.1 <br />Permittee Name: Denver Brick Company ,.,. ` <br />Permit No: M-89-052 ~ _~ <br />Operation Name: Dakota Clay Pit* <br />Anniversary Date: 10/25/93 <br />Total: $225.00 (Due on your Anniversary Date) <br />1. Has this mine been granted TEMPORARY CESSATION STATUS? YES NO <br />Does this mine operate MORE or LESS than 180 days per year? MOREc~ q LESS <br />2a. Financial Warranty: $ 3~0 O D 2b. Permitted acreage: /~ <br />3. Does this mine have a phased reclamation plan? <br />4. Total acres affected during the report year:* ~ <br />5.- Total acres reclaimed for the report year:* <br />6. Total acres in various stages of reclamation:* <br />a. Backfilled: d. Topsoil replaced: <br />b. Graded: Average topsoil thickness <br />c. Seeded: replaced: <br />List species seeded & seeding <br />rate for report year on back <br />7. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:` <br />8 <br />9. <br />* Please show the location of the acreage for items 4 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. <br />** N~IE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />Signature: ~ Date: ~~'-2~'9.~ <br />Please type or print current con act name, mailin address <br />Contact Name: ~a -y,, ~ ~ evrcG Phone <br />Company: bf~ve,-~ /3.-:~~ ~o ~ <br />Address: /,3oh /600 <br />Cow d/~ lQo~~, ~'o ~o7dy~ <br />and phone number below:,/ <br />1303) 6P8 691 / <br />Fede~ai Tax IO No. or Social Security rlo.: ~y~ b~6 ~ 4~6 <br />1~ <br />`~1 <br />Estimated total acres to be affected in the next report year:* 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.