Laserfiche WebLink
Permittee Name: <br />Permit No; <br />Operation Name: <br />Anniversary Date: <br />~ewood Brick and Tile Co. • <br />M-79-045 <br />Church Pit <br />02/2812000 <br />Page 2 <br />Gravel - Albert Frei and Sons, Inc., is mining the gravel <br />under a lease with the mineral right owners this year. A <br />total of 11.94 acres has been stripped in Stage A to prepare <br />it for mining (magenta). The material stripped was placed <br />along the perimeter of Stage A. Mining continued in Stage A <br />on the area west of the road removing most of the pre-law <br />overburden pile and deepening the plant site area. The <br />upper 10 feet of gravel from the south side of Stage A <br />(magenta). This material was blended with material removed <br />from the stripped area (cross hatched \\\) to create the <br />product Frei needs. The current gravel operation has dis- <br />turbed 23.03 acres ± in the mine. <br />{2) No reclamation was required this year. The areas colored <br />green are being backfilled with waste materials from the <br />gravel processing plant. Filling continued on the old clay <br />mining area in the green areas. The backfilling on the <br />south slope of the old clay pit will establish the slope <br />into the excavation area and the bench along that part of <br />the excavation was expanded to make more level processing <br />area. Frei has approximately 5,000 cy of fill material <br />stored in this area that will be used to create slope from <br />the top of the gravel to the bedrock as mining progresses. <br />No additional reclamation is required until mining for both <br />materials is completed in any given stage. <br />(3) Clay - Mining will continue in Stage I or Stage II, no new <br />area will be disturbed this year because we are mining in <br />the area stripped by the sand and gravel operator. We will <br />mine deeper into the clay veins exposed in the past and <br />advance the face to the north as approved in the reclamation <br />plan. Processing will continue in the Clay Plant Site Area <br />in Stage 0 (purple). We are using a small part of the east <br />side of Stage II to store clay produced at a mine near <br />Golden (tan). It is used with the clay from this mine at <br />our brick plant in Lakewood. <br />Gravel - Frei will continue to remove the pre-law overburden <br />piles and mine in the stripped part of Stage A in the south- <br />east part of the mine. To date they have screened the <br />material and hauled it to another site for processing. This <br />may change this year if a crushing plant is installed on <br />Stage A. Stockpiled material was removed this year. <br />(~) No reclamation is called for during the next year. However, <br />Albert Frei and Sons, Inc. will continue to backfill the <br />slope along the south side of the old clay pit. The waste <br />material from processing will be used to widen the flat area <br />on the south side of Stage 0 and fill the lake in the old <br />clay mine. The amount of waste being generated from the old <br />