0 o v <br />v <br />( O <br /> <br />iiiiiuiiiiiiiiiiii <br />For J. A. Kiger October 7, 1994 <br />WEST PIT EXCESS SPOIL FILL CONSTRUCTION UPDATE AND CERTIFICATION <br />During the quarter beginning July 1, 1994 and ending October <br />1, 1994, I inspected the area in which the West Pit Excess Spoil <br />Fill is being constructed. The purpose of these inspections was to <br />observe the on-going construction of the rock drain, inspect the <br />area from which the clay material was removed, inspect the fill for <br />areas of water seepage or surface drainage, inspect the toe filter <br />layer and to satisfy the requirements of CDMG Rule 4.09.1(lla). <br />During the inspections it was observed that all the clay <br />materials have been removed from the bottom of the drainage area <br />between stations 0-30 to 20+50 of the West Pit Excess Spoil Fill, <br />the rock drain had been successfully completed from stations 0-30 <br />to 9+00 of the West Pit Excess Spoil Fill and the toe filter layer <br />is complete from stations 0-30 to 2+00. Two small slide areas were <br />discovered, one above the elevation of the rock drain in the area <br />of stations 1+50 to 2+50 and the other at the elevation of clay <br />removal in the area of stations 2+50 to 4+00. During the quarter <br />several other notable events have occurred in the Excess Spoil Fill <br />Area. The following dates reference the major events that have <br />occurred during the quarter. <br />July 6, 1994 -begin removing clays from the rock drain <br /> area of the West Pit Excess Fill <br />July 11, 1994 - begin excavation of the buttress fill at <br /> the toe of the West Pit Excess Fill <br />July 13, 1994 - finish excavation of the buttress fill at <br /> the toe of the West Pit Excess Fill <br />July 14, 1994 - begin backfill and compaction of the <br /> buttress fill at the toe of the West Pit <br /> Excess Fill <br />July 15, 1994 - complete backfill and compaction of the <br /> buttress fill at the toe of the West Pit <br /> Excess Fill <br />August 10, 1994 - begin placing rocks in the west Pit <br /> Excess Fill Area at station 3+50 and <br /> push them to Station 0-30, 30 feet <br /> beyond the toe of the fill <br />