My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP28536
DRMS
>
Back File Migration
>
Report
>
REP28536
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:59:10 PM
Creation date
11/27/2007 5:06:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978056
IBM Index Class Name
Report
Doc Date
9/29/1997
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ec # d-l2D <br />III IIIIIIIIIIIIIIII ~ C~-# 151~zq <br />r sss <br />' r"C.= I'J~ D <br />Notice of Intent to Continue Mining Operations <br />112c Construction Materials Annual Report SEP 2 9 199 <br />Permittee Name: M S Corporation <br />Permit No. M-78-056 <br />Operation Name: Durham S & G Co Pit ~" ~1 i1 i°~°~~~'S `~'u•`-C~CDy <br />Anniversary Date: September 26, 1997 <br />Total: $550.00 (Due on your Anniversary Date) <br /> <br />1. a. Permitted <br />acreage: ~jc3- b. <br />County <br />where mine is loca CC <br />ted: ~A-+'C.LD <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES ® ' <br />Does this mine operate MORE or LESS t han 180 days per year? MORE LESS <br />3. Does this mine have a phased reclamation plan? YES NO <br />4. Total acres affected during the report year:* (a <br />5. Total acres reclaimed for the report year:* a <br />6. Total rusbar n,` acres ~r, toYSO i.l rep iace!nent s~_aF: <br />_ , <br />a. Average thickness of topsoil replaced: ~~ <br />7. Total number of acres seeded: ~ <br />a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: <br />a. Date reclamation began: <br />9. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* <br />10. Estimated total acres to be affected in the next report year:* lol- <br />11. COMMENTS: <br />* Please show the location of the acreage for items 9 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. For phased operations show dates extraction ceased and dates <br />reclamation began. <br />** NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />Signature: IRt~^~ f~"c Date: L`d ~~~~ <br />Please type or print current cont a""c trr~~nddame, mailing address, and /phone n~u 7mber below: <br />Contact Name: ~~C~~L ~~~C,W~ Phone: ((-'~(~ )~J'~~`~a~r7 <br />'M~ I G~! cam, ~ FAX NO: ('[~O )353-''IU~(T <br />Company: MS ~.VHX U,~llnk-1~~`~u .~'1 i7~~ lM~w"~ C,(~• <br />Address: P~o ~ 3~x Yl~ <br />~~~ ~ ~ <br />r <br />Federal Tax ID No. or Social Security No.: ~~-U~3 ~~~ <br />~@ <br />
The URL can be used to link to this page
Your browser does not support the video tag.