Laserfiche WebLink
i~ <br /> <br />/® Kennecvtt i 4_lh Quarter 2005 <br />Year <br />e <br />e ®Energy Outfall Inspection -Ponds ~ <br />Co/owyo Mine I <br /> Outfall Point <br /> OOtA 002A 003A 004A 005A 006A 007A OOBA 009A 010A Other Other ~ Other Other Other Other <br /> Streeter Work Area Gossard Gulch A Stoker Siding Rail Loop Prospect West Pit Section i6 East Taylor Wash Bay Taylor Pump Aeration West Overftow East Overflow Washbay <br /> Aedimeni Pnnd Pnntl 1 rodnul PnnA Pnnd Pnnd PnM ..A 1 L. <br /> <br />Inspetlion Date <br />11/2/2005 <br />11/212005 <br />1112/2005 <br />11/2J2005 <br />11/2/2005 <br />11/2/2005 ~ <br />71/2/2005 <br />11/2/2005 <br />1V2/2005 <br />11/2/2005 <br />11/2/2005 <br />11/2/2005 <br />11/2/2005 <br />1t/2120Q5 t <br />11%2/2005 <br />11/212605 <br /> Kurt Blunt Kurt Blunt Kud Blunt Kurt Blunt Kurt Blunt Kud Blunt Kud Blunt Kurt Blunt Kurt Blunt Kurt Blunt Kurt Blunt Kud Blunt Kurt Blurit Kun Blunt ~ Kurt Blunt <br />Ins ector: <br />P Ja a Pickarts Ja a Pickarts Jaye Pickarts Ja e Pickarts Ja a Pickads Ja a Pickarts Ja a Pickarts Ja a Pickarts Kurt Blunt Ja a Pickarts Ja a Pickarts Ja a Pickarts J 1 e Pickads Ja a Pickads Ja a Pickarts Ja a Pickarts <br /> <br />a not <br />)a) I <br />Does pond exhibit No No No Nc No No No No Na No No No ( No <br />structural weakness, <br />erosion, or other , <br />hazardous conditions? I <br />1 <br />Lb 1 f <br />1 <br />Mondonng Procedures QuartedylAnnual quarterly/Annual quarterly/Annual quarterly/Annual quanedy/Annual quarterly/Annual quarterly/Annual quartedylAnnual quarterly/Annual quarterly/Annual quarterly/Annual quarterly/Annual quarterly/, <br />and Instrumentation Inspections Inspections Inspections Inspections Inspections Inspections Inspections Inspections Inspections Inspections Inspections Inspections Inspect <br />Lf <br />Elevation & As-built 6563.0 ft. 7151.0 ft. 6368.9 tt. 6fi12.0 fl. 6325.0 ft. 6348 6 ft. 6742.5 ft. 6823.0 fl. 7744.7 ft. 6943.42 ft. 7t 98.0 ft. 6554 B ft 7212.0 ft. <br />Depth Water Level I <br />No No No• <br />quarterly/Annual (quarterly/Annual (quadedy/Annual <br />Inspections Inspections Inspections <br />Dry ~ Dry ~ 7238.5 ft. <br />Ll <br />Existing Storage ~ 0.89 ac-ft.. ~ 6.61 ac-ft. 1.36 ac-R. 4.02 ac-ft. 0.67 ac-ft. 0.53 ac-ft. 1,37 ac-ft. 4.65 arift. 113 ao-ft. 1.71 ac-ft. 15.65 ac-ft. 3.5 ac-ft. 9.7 ac-ft. 4.2 ac-ft. 5.1 ac-fl. 1.25 ac-R, <br />Capacity + <br />l <br />LI Scheduled for Scheduled for Scheduled for <br />e setliment removal None setlimenl removal None None sediment removal None None <br />Maintenance Items (November, 2005) (November, 2005) (November, 2005) <br />Scheduled for <br />None sediment removal None <br />Date: ~I avo5 <br />~• <br />f <br />I am a Licensed Professic <br />Denver, Colorado 8026 <br />operation and the c I <br />Certifed Bv- _ <br />rada and a representative of Knight Piesold and Co., 1050 Seventeenth Street, Suite 450, <br />in this tlocument was provided by Colowyo Coal L.P. Being familiar with the Colowyo <br />information contained herein is reasonable and correct to the best of my experience. <br />Date: N~J_.~S c-~ ~ zJJ~ <br />Pickarts <br />I' <br />Colorado Registered P.E <br />nrzrzoos <br />CF 21.12 <br />