Laserfiche WebLink
<br />999 <br /> <br />August 28, 1998 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RECEIVED <br />AUG 3 1 1998 <br />DIV. OF MINERALS <br />8 GEOLOGY <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />DMG Permit No. M-88-112, TR-010 <br />Weekly Pond Compliance Report <br />August 23 -/A1u,/g~ust 29, 1998 <br />Dear Mr. Dillie: ~,/,~ <br />Attached is a summary of the cyanide analysis performed on samples from <br />the tailings pond and the collection pond during the week of August 23 - <br />August 29, 1998 as required by the approved TR-010. <br />During the week, the tailings pond averaged 0.015 ppm CN-wad and 0.285 <br />ppm CN-total. The collection pond averaged 0.019 ppm CN-wad and 0.035 <br />ppm CN-total. <br />Sincerely, <br />~~. <br />Ron Zumwalt <br />cc: Bill Lyle <br />Dan Robertson <br />