Laserfiche WebLink
Additional Page <br />2005-2006 Annual Report <br />Snyder Quarry <br />M-77-210 <br />Castle Concrete Company <br />Anniversary Date: May 27 <br />Overview of Permit Year: During the 2005-2006 operating year activity was virtually dormant. There was <br />some activity in clean-up of the site and some material was sold out of stockpiles. <br />Annual Report Maps: One map is enclosed. <br />Affected Lands: The amount of affected land has not changed. <br />Reclamation: The site is stable and is not subject to erosion. A 10,000 gallon fuel tank that was used on the <br />site during times of operation was removed from the site. Some of the scrap items that were present around the <br />plant area were removed. <br />Expected Activity (2005 - 2006): It is possible that somewhat more production will occur in the next year. It <br />is still undetermined. <br />Bonding: This operation is self bonded. <br />Castle Concrete 2005-2006 Annual Report M-77-210 Snyder Quarry Page 1 of 1 <br />