Laserfiche WebLink
<br />Item Predicted impact in <br />ermit a lication <br />Observed impact <br />Prediction accurate? <br />UP Railroad Grade changes as predicted. <br />track Grade changes. Track was successfully re- Yes. <br /> leveled. <br /> Indeterminate. As explained <br />Yampa Valley in the attached letter, a <br />Electric prediction of the impacts to <br />Association None. None. this power line should added <br />powerline to the permit. The power line <br /> should also be added to a map <br /> in the ermit. <br /> Approx. 25 <br />Foidel Creek inches (Table 8 of Approximately 24 inches. Yes <br /> Exhibit 4e-3 in <br /> ermit a lication <br />Middle Creek <br />Fish Creek <br />AVF <br />Monitoring <br />well <br />006BRDH7 <br />Ashley <br />impoundment <br />and irrigation <br />ditch <br /> N <br />i <br />d d <br />i <br />hi <br />i <br />d i <br />d <br /> ne <br />ur <br />ng t <br />s report <br />ot un <br />erm ng per <br />o <br />Hayden-Gore <br />Pass <br />owerline <br />Wolcott Tap- <br />W olcott <br />(PSC) <br />owerline <br />Western Area <br />Power <br />Administratio <br />n owerline <br />Routt County <br />Road 33 <br />cc: Dan Hernandez <br />