Laserfiche WebLink
Review Checklist for Subsidence Monitoring Report <br />Mine: Foidel Creek Date this review was completed: 5/1/02 <br />Permit IVo.: C-82-056 CDMG reviewer: Tom Kaldenbach ~K <br />Report period: 2nd half 2001 <br />Panel(s) mined during report period: 12-Right and 13-Right <br />Monitoring requirement Regulation citation [n compliance: <br />Yes/no? Comment <br />Installed and surveyed <br />monuments prior to 2.05.6(6)(c)(i)(A) Yes <br />underminin <br /> Total surface strain is determined <br />Located monuments to by locating monuments at <br />detect vertical 2.05.6(6)(c)(i)(B) Yes expected points of minimum <br />subsidence and strain (over gateroads) and <br />horizontal displacement. maximum strain (over mid- <br /> anel). <br />Monitored each <br />structure's orientation, 2.05.6(6)(c)(i)(C) Yes <br />location, elevation <br />Monitored each <br />monument and structure 2.05.6(6)(c)(i)(D) Yes <br />at least uarterl <br /> The only renewable resource <br /> lands or structures undermined <br /> during the reporting period were <br /> the Union Pacific Railroad <br /> (UPRR) and the YVEA power <br /> line. UPRR locations were <br />Commenced monitoring surveyed 500 ft. before to 1500 ft. <br />of each monument and after undermining, as required in <br />structure at least one 2.05.6(6)(c)(i)(D) Yes Permit. Power line stations were <br />month prior to surveyed at least one month <br />undermining before undermining. (Foidel <br /> Creek survey data from 1 half <br /> 2001 were submitted with this <br /> report, as agreed, to allow for <br /> surveying in springtime. Foidel <br /> Creek stations were surveyed <br /> several months prior to <br /> underminin .) <br />Submitted monitoring <br />report semiannually, (~( ~(.)( ) <br />2.05.6 6 c t E <br />Yes Reporting period included data <br />within 60 days after from 2/27/02. <br />re ortin eriod <br />