Laserfiche WebLink
AP-2 - Loadout west side of tracks adjacent to sediment pond <br />(100 ft south of railroad bridge) <br />i. Monitoring at LAI,S: <br />These wells are to be visited once per week during March <br />through June and once per month during July through <br />October. No monitoring is required during December <br />through February. Water levels are to be measured each <br />visit. During one visit each month, field quality <br />parameters are to be measured and like the MALS wells <br />described above, lab samples are to be taken in April, <br />July, and October. <br />Station: Plans: <br />AP-1 X (all the time) <br /> G-SAR (April and October) <br /> F-SAR (July samples) <br />AP-2 X (all the time) <br /> G-SAR (April and October) <br /> F-SAR (July samples) <br />All wells are to be monitored for depth to water (X) at <br />all of the visits. In April and October, plan G-SAR will <br />be utilized. In July, plan F-SAR will be utilized. <br />L. T.AT• Monitoring Stations: <br />AP-3 - Loadout, W. side of tracks of S. end of loadout. <br />AP-4 - SE corner of loadout area. <br />1. Water Monitoring at i.nr•: <br />Each of these wells should be visited once per week from <br />March through June and once per month during July through <br />October. No monitoring is required at these wells <br />during November through February. <br />Station: Plan: <br />AP-3 X <br />AP-4 X <br />