Laserfiche WebLink
TO: Dan Hernandez, Senior Environmental Protection Specialist <br />FROM: Kirstin Fisher, Engineering and Physical Sciences Intern <br />DATE: January 2, 1997 <br />RE: Review of the 1995 <br />Kerr Coal Company <br />Kerr Coal Mine <br />Mining Permit No. <br />Annual Hydrologic Report <br />C-SO-006 <br />In the review of the 1995 Ki <br />will be checked: compliance ~ <br />and the compliance with the s <br />with these requirements, the <br />adverse effects mining has <br />baseline water quality data <br />data. <br />:rr Mine AHR, the following standards <br />with the set water monitoring schedule <br />et water monitoring parameters. Along <br />water quality will be checked for any <br />had on the hydrologic balance. The <br />will be used to compare to the 1995 <br />Water Monitoring Requirements <br />The water monitoring program for the Kerr Mine was revised in <br />January 1991. The new water monitoring program has ten different <br />sampling plans, noted by plan A, B, C, D, E, F, G, X, XF, G-SAR, <br />and F-SAR. Each plan has a different set of parameters. Two plans <br />may be used on the same monitoring site, e.g. one in summer and one <br />in winter. The following tables will identify the water monitoring <br />plans at each station and the descriptions below will explain each <br />plan and the parameters that it contains. <br />A. Monitoring Stations (Mine Area): <br />