<br />• For the future expansion of both waste piles, two expansion <br />schemes have been assumed. Expansion plan "A" is shown on Plate 6, <br />Waste Piles, "A" Expansions. Corresponding cross-sections of this ex- <br />pansion are shown on Plates 8 and 9. On the east side of the creek, <br />expansion "A" assumes an increased height of the pile to approximately <br />elevation 6,115 feet. It also asswnes a very slight extension toward <br />the north but no expansion towards the south. As discussed in Section <br />4.3, the southernmost end of the existing east waste pile should be <br />removed for stability purposes. Expansion plan "A" on the east side <br />of the creek represents some additional 70,000 yd3 or approximately <br />2.5 years of additional operation. <br />For the west side of the creek, it was assumed that: the pile <br />will be extended toward the north, with the maximum elevation ~~f the top <br />of the pile at 6,725 feet. On the south side of the west pile, a minor <br />extension into the present storage yard and increased height pile to <br />elevation 6,755 feet has been assumed. The expansions comprise ad- <br />• ditional yardages of 81,000 yd3 on the north end (3 years of oper- <br />ation) and 104,000 yd3 on the south side (4 years of operation). <br />Expansion "B" is shown on Plate 7, Waste Piles, "B" Expansions, <br />and in the cross-sections (Plates 8 and 9). This expansion assumes <br />a further increase of the height of the east pile providing additional <br />volume of 73,000 yd3 (2.5 years of operation) and a considerable <br />extension toward the south on the west side of the creek. Increased <br />height to elevation 6,755 feet also is assumed on this side. It can be <br />seen that considerable storage volume is available on the west side <br />when the pile is extended toward the south. The reason for such an <br />important volume of storage is because of the significant width of the <br />Ralston Creek alluvial valley at this location. Some 275,000 yd3 <br />(approximately 10 years of operation) could be obtained if Expansion <br />plan "B" is implemented. <br />• <br />- 17 - <br />