Laserfiche WebLink
r III IIIIIIIIIIIII III ~ <br />BATTLE MOUNTAIN GOLD COMPANY <br />~~/ J <br />~' ~1og2 <br />June 3, 1992 <br />~N <br />~ a\ma O~O`,,;s~o~ <br />pec <br />Dr. James Pendleton <br />Colorado Mined Land Reclamation Division <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />BATTLE MOUNWN <br />GOID COMPANY <br />RE: Response to Questions from Allen Sorenson Regarding San <br />Luis Tailings Facility <br />Battle Mountain Resources ("BMR") Permit No. <br />Dear Dr. Pendleton: <br />Enclosed with this letter you will find a technical memorandum <br />prepared by Steffen Robertson and Kirsten ("SRK"), the design <br />consultant for the San Luis tailings facility. The memorandum <br />responds to questions regarding the design of the facility <br />directed by Allen Sorenson of your staff to Rob Dorey of SRK <br />and discussed in subsequent meeting with BMR representatives. <br />We believe that the memorandum is fully responsive to the <br />questions raised by Mr. Sorenson and would request that further <br />questions or requests for additional information be directed to <br />BMR. Thank you. <br />Very truly yours, <br />Andre J. Douchane <br />Vice President of Operations <br />Battle Mountain Resources\ <br />AJD:tc <br />cc: Dean Massey <br />5670 GREENWOOD PLAZA BLVD. SUITE 106 ENGLEWOOD, CO 80111 (303) 721fi74t FAX (303) 721.6613 <br />