Laserfiche WebLink
.~ <br />Iuly 12, 2001 <br />Golden Eagle Mine <br />Rili & Gully Inspection <br />Ronald G. Thompson <br />Peak Project Management <br />3800 County Road 63.9 <br />Trinidad, Colorado 81082 <br />_- -£ <br />Reclamation areas of the Golden Eagle Mine were visually inspected for the presence of erosional features <br />requiring maintenance. The following conditions were observed: <br />Rock check dams installed across erosion channels on the north-facing slope where the coal loadout was <br />located appear to be controlling erosion as no new erosion has been noted. <br />Ares with growth of Canadian Thistle were sprayed: Pond 3 and Pond 4 reclamation aeeas and the north <br />facing slope along the railroad tracks. <br />No problems from erosion were noted else~.vhere wi[hin the reciamation areas <br />~~ <br />