Laserfiche WebLink
I CAMEO MINE INFLOWS <br />OCTOBER 6, 1988 <br />• <br /> Flow pN Temp Cond <br />Location Description 6PM Su °C pmhos/cm <br />1 Portal excavation subdrains -flow 51.2 8.8 17° 1650 <br /> pumped from portal sump. <br />2 No. 1 North Mains Return - small inflows 0.35 8.0 17° 3400 <br /> from roof floor and ribs in incline. <br />3 No. 1 North Mains Return at 12+00 - flow 10.6 8.4 17° 3300 <br /> from location 2 plus small inflows from <br /> floor, roof and rib. <br />4 No. 1 North Mains Intake at 37+00 - small 4.1 9.0 13° 3600 <br /> inflows from roof, floor and rib below <br /> Location 3. <br />5 No. 1 North Mains Belt at 37+00 - small 0.28 9.0 13° 4000 <br /> inflows from floor and rib. <br />6 No. 1 West Mains Intake at 2+00 - flow 5.4 8.7 13° 2500 <br /> from Location 7 plus small inflows from <br />• floor, roof and ribs. <br />7 No. 1 West Mains Intake at 40+00 - inflows 1.0 8.6 14° 1720 <br /> from floor, roof and ribs at the west end <br /> of No. 1 West Mains. <br />8 No. 1 East Mains Seals - drained at 29.0* 7.9 - 3100 <br /> variable rate. <br /> Total Measured Inflows (location 1+3+4+5+6+8) 100.3 6PM <br />* Flow calculated from average September discharge minus measured flows <br />• Table M88-1 <br />