Laserfiche WebLink
Mine Bench Stabilization <br />November 9, 1984 <br />Page 4 <br />9. Photo documentation of all construction procedures and <br />conditions should be made. The photograph interval should <br />be sufficient enough to adequately document areas of <br />excavation, methodologies used at problem areas, and <br />general overall activity. <br />10. Forms to assist in construction documentation should be <br />utilized to provide consistency in the documentation. <br />Sample forms which may assist you in these operations are <br />provided and may be utilized or similar forms utilized to <br />perform this documentation. <br />Additional construction procedures to be utilized during the <br />construction operations have been previously provided within the <br />technical specifications and should be followed to provide <br />consistency with the design assumptions. <br />I If you have any questions, or if problems arise, please contact <br />me. <br />Respectfully submitted, <br />ROCKY MO NTAIN.,GEOTECHNICAL, INC. <br />/ ice/ v i <br />~ichard J. G-eenw , P.E. <br />RJG/msl <br />RMG Job No. 523/26064 <br />cc Bill Tate <br />. • <br />