My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP28140
DRMS
>
Back File Migration
>
Report
>
REP28140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:58:52 PM
Creation date
11/27/2007 4:57:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Report
Doc Date
9/8/1983
Doc Name
BLUE RIBBON COAL CO RESPONSE TO INSPECTION PROBLEM NO 047-15
From
MLRD
To
JIM PENDLETON
Permit Index Doc Type
STABILITY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ . ~; <br />DEPARTMENT OF NATURAL RESOURCES III III III IIIIIII III <br />999 <br />David H. Getches, Executive Director <br />MINED LAND RECLAMATION DIVISION ~ <br />DAVID C. SHELTON, Director <br />R~chdrrl D Lamm <br />Governor <br />September 8, 1983 <br />TU: Bob Liddle <br />FROM: Jiln Pendleton <br />RE: Blue Ribbon Lo Col 1y's Respunse to Inspection Problem <br />No. 047-83-15 <br />On June 'LU, 19£i3, Roy Cox and I perfonned a partial geotechnical inspection of <br />the Blue Ribbon mine site. As a result of that inspection, I noted Problem <br />No. 041-83-15. <br />"U 47-83-15. The operator must submit a proposed remedial treatment <br />fur the mine portal bench landslide area prior to July 31, 1983. The <br />remedial treatment must be accomplished prior to the end of the 1983 <br />construction season." <br />Further, in that same inspection report, I observed: <br />"The operator should develop a remedial treatment for the affected <br />portion of the bencYt. This remedial treatment should prevent <br />environmental harm and hazard to public health and safety. A proposed <br />remedial treatment should be submitted to the Division prior to <br />July :tl, 1983. This remedial treatment should be accomplished prior to <br />the end of the 1983 construction season." <br />The operator's response, dated July 28, 1983, and received in our office <br />Auyust 2, 1983, presents the results of their remedial efforts on the mine <br />bench. They have completed four specific mitigative treatments: <br />(1) Rerouted a sewer line, whose rupture had apparently worsened bench <br />saturation. <br />(2) Located and drained an old leach field, which had also contributed to <br />bench saturation. <br />(3) Extended the underground mine drainage discharge pipe across the bench <br />and down its face. <br />(4) Relocated the screening apparatus on the mine bench to a cut section of <br />the bench, which should be more stable. <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 60203 Tel. (303) 866-3567 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.