My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-04-10_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2003-04-10_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 5:59:09 PM
Creation date
11/27/2007 4:57:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
4/10/2003
Doc Name
Annual Report
Permit Index Doc Type
Annual Fee / Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECE~V~~ <br />Cripple Creek & Victor Gold Mining Company APR ~ ~ ~ <br />A Joint Venture -Pikes Peak Mining Company, Manager <br />Operations Office Englewood Office Dit'isiaq ~f <br />P.O. Box 191, 100 North 3rd Street P.O. Box 5078, 5251 DTC Parkway, SuTd'~Oaq~pp„i„~_ <br />Victor, CO 80860 Englewood, CO 80155 '""`~7Y <br />(719) 689-2977 • FAX (719) 689-3254 (303) 889-0700 • FAX (303) 889-0707 <br />SENT CERTIFIED, RETURN RECEIPT REQUESTED <br />7001-1140-0000-7949-2869 <br />April 9, 2003 RECEIVEp <br />Mr. Berhan Keffelew <br />Sr. Environmental Protection Specialist ~FOn °; , <br />Office of Mined Land Reclamation ~ - ''' 0ept09Y <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RE: Cresson Proiect, Permit M-1980-244 Annual Report and Fee <br />Dear Mr. Keffelew: <br />Enclosed please find the annual report form, annual fee of $1,000.00 (check no. , and map for <br />Cripple Creek & Victor Gold Mining Company's ("CC&V") Cresson Project, Permit M-1980-244. This <br />report covers the time period between April 2002 and April 2003. <br />Reportable Conditions: <br />Amendment No. 8 site preparation and development activities continued in the Main Cresson and East <br />Cresson Mine areas and Phase IV of the Valley Leach Facility ("VLF"). The new crusher area was <br />completed during the year. Remaining Amendment No. 8 activities will continue throughout 2003 and <br />beyond. <br />CCBV implemented reclamation techniques on approximately 44 acres of land during the reporting <br />period. The acreage consisted of development rock removal areas, highway 67 realignment and related <br />disturbances within the permit boundary, Enhanced Management Practice storm water structures, topsoil <br />stockpiles, powerline access corridor, and miscellaneous reclamation along new roads and construction <br />sites. Approximately 10 acres of previously reported reclaimed acres were impacted by construction <br />activities and were reclaimed again in 2002. <br />Per the requirements of C.R.S. 34-32-116(3), and C.R.S. 34-32.5-116(3)(a): <br />Reclamation accomplished to date: Approximately 212 acres <br />Reclamation accomplished during the preceding year.• Approximately 44 acres <br />New disturbances anticipated during the upcoming year. Continued construction of Phase IV of the <br />VLF; continued development of the Main Cresson and East Cresson Mine areas and associated <br />haulroads, sediment control measures, topsoil stockpiles, and other ancillary disturbances <br />required to support these activities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.