Laserfiche WebLink
~. <br /> <br />We were advised that the mine had produced approximately 25,961 tons of waste coal during the month of <br />July 2005: 26,829 tons during August 2005: and approximately 20,474 tons during September 2005. It is <br />our understanding that the fines being produced at the wash plant, which consists of 10 to 20 percent of the <br />total materials being produced, are being pumped underground into the mine. <br />Based on our limited observations, it appeazs that the pile is currently being constructed and maintained in <br />general accordance with the project specifications and plans submitted under 2.05.3(8) and that the <br />potential hazazd to human life and property at the site in its present condition is minintal. This report <br />fulfills the quarterly inspection requirements as specified by Rules 4.09.1(11)(a), 4.09.1(11)(b), 4.10.2(2)(a) <br />and 4.10.2(2)(b). If yoi~i ve any questions regazding this report or our observations, please contact this <br />office. r ' <br />Sincerely, <br />xwcc, r <br />Brian L~ fRa P <br />t,4 <br />xc: Byron"@.,,~~'~lt~`ofMinerals & Geology <br />Job Number: 99-3983 NWCC, Inc. Page 2 <br />