a road and drainage ditch have been constructed at approximately the 7100 <br />foot elevation. The expansion will be constructed in this manner to allow <br />the site currently being utilized for road surface material to remain accessable <br />as long as possible. <br />If any portion of the Streeter drainage is blocked during construc- <br />tion, any run off water would flow down the ramp into the pit, preventing <br />any water from being impounded adjacent to the fill. When the fill expansion <br />from the west is begun, the drainage ditch will be constructed all along <br />the north side of the fill to provide drainage to the Streeter sediment <br />pond. <br />All hydrologic conditions that differ from the mine plan submitted <br />on February 5, 1981 will be re-calculated and submitted to the Division <br />and OSM by May 18, 1981. Also, any other maps that will be changed because <br />of this revision, such as spoil grading and topsoil handling, will be resub- <br />mitted by May 18, 1981. <br />Topsoil removal, spoil placement, and reclamation of the additional <br />spoil area will be completed in accordance with the plan submitted on February 5, <br />1981. <br />Environmental Resources <br />Any resources on this site that are not addressed in the February 5, <br />1981 application, such as soils and archeology will be completed as soon <br />as the surface rights are obtained, and will be submitted to the Division <br />by May 26, 1981. <br />Newspaper Advertisement <br />A copy of the proposed newspaper advertisement for this Technical <br />Revision is attached. <br />Permit Boundary Change <br />The additional area to be added to the permit boundary is described <br />below: <br />Township 3 North, Range 93 West of the 6th P.M. <br />Section 2: Lots 3 (9.65 acres) and 4 (41.70 acres) <br />Section 3: Lots 1 (41.65 acres) and 2 (41.62 acres) <br />