Laserfiche WebLink
<br />:~ <br />• COLOWYO COAL COMPANY <br />5131 STATE HIGHWAY 13 MEEKER. COLORADO 816x1 <br />~~ TELEPHONE 13031 B24~ba51 <br />Mr. Fred Hanta <br />Colorado Mined Land Reclamation Division <br />1313 Sherman Street <br />Denver, CO 80203 <br />Mr. John Hardaway <br />Office of Surface Mining <br />Brooks Tower <br />1020 15th Street <br />Denver, CO 80202 <br />iii iiiiuiiiiiiiiii <br />999 <br />b]ay 6 , 1981 <br />Re: Technical Revision to Colowyo's Permit <br />No. 76-15 C/A <br />Gentlemen: <br />Colowyo requests a Technical Revision to its current mining and <br />reclamation plan to allow the disposal of additional spoil material outside <br />of the pit back fill operations. Attached is the necessary information <br />for the Technical Revision. <br />This request is being submitted separate from Colowyo's February 5, <br />1981 major application because additional dump room is needed in the near <br />future. This request provides for an expansion of the Streeter fill, which <br />is included as an Experimental Mining Practice in Colowyo's February 5, <br />1981 application. Colowyo understands that the entire Streeter fill will <br />be analyzed for approval as a part of the February 5, 1981 application. <br />To assist in the stability analysis of the fill, Colowyo has contracted <br />with CTL Thompson, Inc. to conduct a stability analysis in consultation <br />with the Colorado MLRD and the U. S. Office of Surface Mining. Also, Colowyo <br />is currently installing a piezometer well in the Streeter fill. <br />This request is submitted as a Technical Revision because it <br />will require an incidental permit boundary revision and will not significantly <br />alter Colowyo's current reclamation plan. This request may be a temporary <br />alteration in that Colowyo will place spoil material to the north of the <br />existing Streeter fill, with the understanding that if analysis of the <br />Experimental Practice by MLRD and OSM finds that the additional fill material <br />is unstable, then Colowyo will remove the material to a suitable site, <br />or complete the necessary work to stabilize the fill to the satisfaction <br />of the b1LRD. <br />