Laserfiche WebLink
<br />,,,~ III IIIIIIIIIIIII III <br />PEABODY <br />~~~~~ Peabody Wesfem Coal Company <br />February 25, 1994 - <br />~~'y~. f <br />I) 199q <br />Ms. Janet Binns ~., <br />Division of Minerals and Geology _ <br />1313 Sherman Street, Room 215 ~ --~ .r,~ <br />Denver, CO 80203-2273 <br />RE: Hayden Gulch Loadout Permit C-92-081 <br />Annual Hydrology Report <br />Dear Ms. Binns: <br />On behalf of Hayden Gulch Terminal, Inc., enclosed please find <br />two (2) copies of the 1993 Annual Hydrology Report (AHR) for the <br />Hayden Gulch Loadout. This report contains a compilation and <br />analysis of all hydrologic data collected during the period <br />extending from January 1, 1993 through December 31, 1993. One <br />(1) copy of this report was also forwarded to OSMRE's office in <br />Albuquerque to the attention of Robert Hagen. <br />Please contact John Cochran, Senior Hydrologist in Flagstaff, <br />Dennis Jones, Hydrologist at Seneca Mine, or me if you or any <br />other members of the Division have any questions or wish to <br />discuss the report. <br />Sincerely, <br />Gary W. Wendt <br />Manager <br />Environmental Affairs <br />bd <br />Enclosure(s) <br />c: Robert Hagen, OSMRE, Albuquerque <br />Dennis Jones, PWCC, Seneca Mine <br />Peabody Wesrom Coal Company • 1300 SaRh Tak Strwf • Flopafaff, Ariaono 86001 • TolopAeno (604) 771-SZSS • Fax (60]) 777.45% <br />