Laserfiche WebLink
7- <br />North Thamoson Creek Mines <br />Acres DimensionsMotes Date Reclaimed <br />Refuse Pile 8.0 1986 <br />Refuse Pond and P-9 1.4 Not Reclaimed <br />Pond P-9 0.4 Permanent <br />No. 3 Mine 4.4 1987 <br />No. 3 Mine Pipeline To No. 1 Mine 0.3 Permanent <br />Water Tank 1.4 1987 <br />No. 1 Mine Fan Site 0.8 1987 <br />- Reclaimed Pond P-1 0.1 1994 <br />Reclaimed Pond P-3 0.7 1994 <br />Reclaimed Pond P-4 0.1 1994 <br />Reclaimed Pond P-5 0.6 1994 <br />Reclaimed Pond P-6 0.3 1994 <br />Reclaimed Pond P-7 8 8 0.5 1994 <br />Subtotal Ponds 2.3 Acres <br />Truck Scales 0.2 1987 <br />Flumes 2 North & 2 Middle Thompson 0.2 1986 <br />Stoney Ridge Power Line 1.3 3740 15 1987 <br />Stoney Ridge Fan Site 0.1 1987 <br />Stoney Ridge Road 5.3 15370 15 Permanent <br /> <br />Total Mine Site 47.7 <br />Reclaimed 1986 Refuse Pile & Flumes 8.2 <br />Reclaimed 1987 31.2 3.4 Permanent <br />Reclaimed Ponds 1994 2.3 Permanent County Road Ditch <br />Permanent 6.0 <br />Total Mine Site 47.7 <br />Paved Road to Prime Farmland 9.2 10000 40 Permanent <br />Paved Truck Dump 0.9 270 150 Permanent <br />Topsoil & Stockpile Areas 3.7 Permanent <br />Slope Below Truck Dump 0.5 400 50 1987 <br />Conveyor Corridor Bench 1 0.7 700 50 1987 <br />Conveyor Corridor Bench 2 0.6 500 50 1987 <br />Subtotal Reclaimed at Loadout 1.8 ,, Acres <br />Total Loadout 15.6 <br />Total Acres Disturbed Mine &Loadout <br />Lona Term <br />Refuse Pile Pond 63.3 <br /> <br />1.3 63.3 <br />No. 3 Mine Pipeline To No. 1 Mine 0.3 <br />Farm Access Road -Bench 1" 0.1 550 10 <br />Paved Road to Prime Farmland 9.2 <br />Paved Truck Dump 0.9 <br />Topsoil & Stockpile Areas 3.7 <br /> <br />" Reclaimed then Convened to Permanent <br />Permanent <br />Total Permanent 23.4 <br />3.5 <br />19.9 <br />23.4 23.3 <br />3.5 <br />19.8 <br />23.3 <br />