Laserfiche WebLink
• ANNUAL REPORT • <br />INSTRUCTIONS <br />According to C.I2:S. 34-3^_-1 16(3), and C.R.S. 34-32.5-1 16(3)(a), on the anniversary date of the permit each year, <br />the operator shall submit a report and a map showing the extent of current disturbance to affected land, <br />reclamation accomplished to date and during [he preceding year, new disturbances [ha are anticipated [o occur <br />during the upcoming year, and reclamation that will be performed during the upcomin year. Please attach such <br />a report and map to enclosed annual report form. (An adequately labeled map that clearly delineates and includes <br />the above elements may suffice for a written report.) <br />If your operation is subject to [he provisions of Temporary Cessation as defined in the~1 c[ and Rules, you must <br />provide with the Annual Report the following information as required by 2 CCR 407-1, 407-4, and Rules <br />1.13.7(I)(a): <br />(i) the condition of the operation at the time of cessation; <br />-- (ii) what specific measures have been and will be implemented to comply witf~ reclamation, performance <br />standards and Environmental Protection Plan requirements, if they are part of your approved application; and <br />(iii) plans for resumption of mining operations. <br />Please provide the additional following information with your Annual Report, as <br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules l.l~(1), provide <br />regarding the sufficiency of the value of the Financial Warranty, specifically: <br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules I.IS(1.)( <br />statement regarding the sufficiency of the value of the financial wart; <br />irrevocable letters of credit, Deeds of Trust, and security agreements, <br />credit, and first priority liens on project related fixtures. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)( <br />Deed of Trust or a Security Agreement, the operator shall submit an <br />independent appraiser, indicating any changes in property value, and <br />any circumstances which may affect the adequacy of the Deed of Tn; <br />and the value of the property subject to either of these inswments. 1 <br />proof that there aze no past-due property taxes. <br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), pe <br />Irrevocable Le[[er of Credit, the operator shall have the bank provide c <br />of a balance sheet, certified by a Certified Public Accountant, demons <br />Credit does not exceed ten percent (10°!0) of the bank's capital surplus <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.9.3(c), <br />Priority Lien on any fixtures and Equipment, the operator shall provi~ <br />. detail to fully describe the condition, value, and location of all pledge <br />updated statement <br />provide an updated <br />~. Specifically, <br />If-insurance, salvage <br />permits secured with a <br />late, by a;qualified <br />tatement ~summarizi ng <br />or Security agreement, <br />report shall also provide <br />i <br />---• I-- - --- _ <br />with an <br />in the form <br />Letter of <br />.` <br />ertnits secured by a First <br />a report in sufficient <br />fixtures and equipment. <br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules I.IS(1)(c), all monitoring information <br />required as part of the approved permit application, to include the Environmental Protection Plan. (Please <br />note that if you are not a Designated Mining Operation, you will not have an Environmental Protection <br />Plan as part of your approved permit.) <br />