My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP27772
DRMS
>
Back File Migration
>
Report
>
REP27772
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:58:36 PM
Creation date
11/27/2007 4:52:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
7/24/1991
Doc Name
2ND QUARTERLY WASTE DISPOSAL AREA INSPECTION REPORT NEW WEST RIDGE PILE
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• `~~`~ ~ IIIllllllllllllllll <br />ORCHARD VALLEY M <br />~,~td. QUARTERLY WASTE DISPOSAL AREA INSPECTION REPORT <br />NEW WEST RIDGE PILE <br />Item Y/N Comments <br />1. Quantity of waste N There has been no gob hauled to the waste <br />material added to waste disposal pile this quarter. Topsoil and <br />disposal area this subsoil was removed to uncover the gob so <br />quarter. gob could be shipped to the Nucla Power <br /> Plat. <br />2. Waste material deposited N Uppermost 4' of gob was removed and shipped <br />and compacted in 24" out. <br />lifts. <br />3. Drainage alterations Y Drainage o¢ second lever was further <br />constructed. improved to drain water from top of pile to <br /> drainage ditches at the tce of pile. Also <br /> top of pile was shaped so that proper <br /> drainage to ditches would occur. <br />4. Present height of waste Highest height approximately 74.7. <br />material. <br />5. New bench constructed? N Topsoil and subsoil salvage operations have <br /> exposed gob o¢ 2nd level of pile. Gob has <br /> been dozed up in center of pile to <br /> facilitate loading operations. Drainage was <br /> contained within a soil berm around the <br /> perimeter of the exposed level. Drainage <br /> was directed away from the ourslopes of the <br /> pile and into the drainage ditch at the toe <br /> of the pile. <br />6. Refuse material outslope Y Slopes have been checked for proper placement, <br />placed at lV:2H? <br />7. Top of completed fill Y Top of gob has been sloped with no soil cover. <br />has adequate draimge? <br />S. Bench drainage adequate? Y Bench drainage was maintained throughout <br /> soil salvage and gob shipping operations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.