Laserfiche WebLink
• `~~`~ ~ IIIllllllllllllllll <br />ORCHARD VALLEY M <br />~,~td. QUARTERLY WASTE DISPOSAL AREA INSPECTION REPORT <br />NEW WEST RIDGE PILE <br />Item Y/N Comments <br />1. Quantity of waste N There has been no gob hauled to the waste <br />material added to waste disposal pile this quarter. Topsoil and <br />disposal area this subsoil was removed to uncover the gob so <br />quarter. gob could be shipped to the Nucla Power <br /> Plat. <br />2. Waste material deposited N Uppermost 4' of gob was removed and shipped <br />and compacted in 24" out. <br />lifts. <br />3. Drainage alterations Y Drainage o¢ second lever was further <br />constructed. improved to drain water from top of pile to <br /> drainage ditches at the tce of pile. Also <br /> top of pile was shaped so that proper <br /> drainage to ditches would occur. <br />4. Present height of waste Highest height approximately 74.7. <br />material. <br />5. New bench constructed? N Topsoil and subsoil salvage operations have <br /> exposed gob o¢ 2nd level of pile. Gob has <br /> been dozed up in center of pile to <br /> facilitate loading operations. Drainage was <br /> contained within a soil berm around the <br /> perimeter of the exposed level. Drainage <br /> was directed away from the ourslopes of the <br /> pile and into the drainage ditch at the toe <br /> of the pile. <br />6. Refuse material outslope Y Slopes have been checked for proper placement, <br />placed at lV:2H? <br />7. Top of completed fill Y Top of gob has been sloped with no soil cover. <br />has adequate draimge? <br />S. Bench drainage adequate? Y Bench drainage was maintained throughout <br /> soil salvage and gob shipping operations. <br />