Laserfiche WebLink
ENGINEERING & SURVEYING, INC. <br />July 23, 1998 <br />Harry Ranney <br />Colorado Division of Minerals & Geology <br />1313 Sherman Street -Room 215 <br />Denver, Colorado 80203 <br />RECEIVED <br />JUL 2 7 B9A <br />DIV. OF MINERALS <br />8 GEOLOGY <br />RE: CARBON JUNCTION MINE; NO. C-92-080; SECOND QUARTER REPORT, 1998 <br />Dear Mr. Ranney: <br />During the previous quarter (through June 30, 1998) work has continued on the Carbon <br />Junction rechanneli~ation within Carbon Junction Canyon as shown on Map 5-10. Specifically, <br />reshaping of the fill pile and cutting the channel have been partially completed. <br />One of the items which remains from my last (4-06-98) report still need attention (see <br />attached). Also, I have added items pertaining to the rechannelization. <br />I have enclosed copies of recent density tests conducted on the fill pile. <br />This constitutes my report for the period mentioned. <br />cc: 1) Jim Hendricks <br />2) Mike Savage <br />enclosures: Field density tests <br />III IIIIIIIIIIIIIIII <br />999 <br />555 SOUTH CAMINO DEL RIO <br />BODO PROFESSIONAL CENTER UNIT A~ I <br />POST OFFICE BOX 97 <br />DU RANGO. COLORADO 81302-0097 <br />TELEPHONE 970247-1705 <br />FAX 970-247-1710 <br />CONSULTING CIVIL AND SANITARY ENGINEERING <br />LAND. UTILITY AND CONSTRUCTION SURVEYS <br />HLG/ss <br />