Laserfiche WebLink
ANNUAL FEE AND REPORT <br />September 15, 2007 <br />L & L READY MIX <br />M-1998-059 <br />Operation: Sunny Dale Farm Pit <br />County: Phillips <br />Anniversary Date: September 15, 2007 <br />We continue to extract the clean gravel from the dry creek bed, which is about three foot <br />deep. We are active at the area in the far Northeast corner of section 14. There is no <br />topsoil in the bed to remove but we have stripped the dirty gravel off of the top (fill <br />gravel). What is not hauled in is stockpiled along the edge to be hauled in later for road <br />base. Beneath we extract the clean and haul in to be used as concrete aggregate. The <br />entrance to the active site is approximately 1/8 of a mile south of road 22 on road 23, on <br />the west side (right into pit) as noted in the revision done in 2005. We anticipate the life <br />of the mine to be approximately 2 more years. We will be sloping the few banks, where <br />there are banks, and seeding the area that is not remaining as part of the creek bed in the <br />areas completed starting in the spring if the winter weather permits us to extract as <br />planned. <br />(CK.#9399 $791.00 enclosed) <br />(maps enclosed) ~~ ~~ <br />~~-<~=~-~'r <br />Laurine Koellner <br />