Laserfiche WebLink
<br />TWIN PINES <br />TECH. REV. 3 <br />PAGE 4 <br />INSPECTIDN DF THE SPDIL PILE L FACILITIES <br />Construction of the sedimentation pond and site preparation of <br />the spoil area will completed under the direction of a <br />Registered Professional Engineer. The facilities will be so <br />Certified in accordance with sections 4.05.6 and 4.10 of the <br />Rules and Regualations for Coal Mining. The spoil pile will be <br />inspecte quarterl to ensure proper drainage, construction, and <br />compaction of fhe ile. Insitu compaction tests will be taken <br />quarterly to verify proper -compaction of_the_ pile.- " h° <br />! esign slopes of the pile, stability will not be a concern - <br />u` ~-- -- ---- - -- - - - ----- -- --- -- ~-- --- -- <br />RECLAMATION OF THE SITE <br />The site will generally be reclaimed as shown to the "Reclaimed <br />Site" drawing enclosed. Final reclamation and configuration will <br />be a function of the amount of waste generated during the life of <br />the mine. Material available on site and that stockpile from <br />stripping the spoil will be utilized to complete the final 2 foot <br />cover on the spoil pile and blend the site to best conform to the <br />surrounding terrain. Considering the facf tFiat~?•ie spo.I mat~1~Y <br />s non-taxi- and-lion acid tfan'ming„~.~y~, ~"'~,3fic3ii~q("~'!JE' <br />€#i~en~l:,_' ro4ide an at'Eep~~•'i°e^~gcvw.tlr=tni-~~nr-reJ~git~~~ian. <br />uccess.i - n general all reclamation should be able to be <br />accomplished with a dozer. Slopes will be left in roughened <br />condition, Ieaving the grazer imprints to hold moisture and <br />retain seed. Seeding and mulching shall be in accordance with <br />section 2.05.4 of the application. Seed mixtures may be altered <br />pending an investigation by the Soil Conservation Service into <br />sodium tollerant seed mixtures. If a desirable mixture is found <br />which may have a better success rate than the surrounding <br />reclamation, the mixtures will be submitted for approval by the <br />Division. There is no top soil available on the proposed site for <br />reclamation of the area. <br />BOND REQUIREMENTS <br />It is estimated that reclamation of the site can be accomplished <br />with a D-8 size dozer working 40 hours. (This includes filling <br />the sedimentation pond). Local owner operators are available <br />and qualified to accomplish the work. Dn this basis the cost of <br />reclamation far the site will be: <br />D-8 dozer 40 hours a ~]00.00/hr -------- s 4,000.00 <br />Inspection, supervision, etc. a 25% ------ $ 1,000.00 <br />Seeding_L Mulching say 2.5 acres x_$600/_ac__ffi 1:500.00 <br />obilization (2 times a ~O®:OO)~f,~,,;.,==~-1 ~' `~00 <br />- TDTAL INCREASE IN EDND ----- %~6 700.~bb~ <br />4 <br />