My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP27630
DRMS
>
Back File Migration
>
Report
>
REP27630
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:58:30 PM
Creation date
11/27/2007 4:49:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Report
Doc Date
1/21/2003
Doc Name
1st Half 2002 Review Checklist for Subsidence Monitoring Report
From
Tom Kaldenbach
To
File
Permit Index Doc Type
Subsidence Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` Review Checklist for Subsidence Monitoring Report <br />Mine: Foidel Creek Date this review was completed: 1/21/03 <br />Permit No.: C-82-056 CDMG reviewer: Tom Kaldenbach <br />Report period: 1`~ half 2002 <br />Panel(s) mined during report period: 13-Right attd 14-Right <br />Monitoring requirement Regulation citation In compliance: <br />Yes / no ? Comment <br />Installed and surveyed <br />monuments prior to 2.05.6(6)(c)(i)(A) Yes <br />underminin . <br /> Total surface strain is determined <br />Located monuments to by locating monuments at <br />detect vertical 2.05.6(6)(c)(i)(B) Yes expected points of minimum <br />subsidence and strain (over gateroads) and <br />horizontal displacement. maximum strain (over mid- <br /> anel). <br />Monitored each <br />structure's orientation, 2.05.6(6)(c)(i)(C) Yes <br />location, elevation. <br />Monitored each <br />monument and structure 2.05.6(6)(c)(i)(D) Yes <br />at least uarterl . <br /> The only renewable resource <br /> lands or structures undermined <br /> during the reporting period were <br />Commenced monitoring the Union Pacific Railroad <br />of each monument and (UPRR) and the YVEA power <br />structure at least one 2.05.6(6)(c)(i)(D) Yes line. UPRR locations were <br />month prior to surveyed 500 ft. before to 1500 ft. <br />undermining. after undermining, as required in <br /> permit. Power line stations were <br /> surveyed at least one month <br /> before undertninin . <br />Submitted monitoring 2.05.6(6)(c)(i)(E) Yes <br />re ort semiannuall . <br />
The URL can be used to link to this page
Your browser does not support the video tag.