Laserfiche WebLink
RAG EMPIRE CORPORATION WASTE PILE INSPECTION FORM <br />PILE LD. NO. 1211-CO-09-01370-O1 (SURFACE WASTE PILE) <br />PILE I.D. NO. 1211-CO-09-01370-02 (OLD N0.9 EXCAVATION) <br />INSPECTOR <br />INSPECTOR TITLE: <br />Under the su ision of Michael W. Ludlow, Colorado P.E. #24046 <br />This inspection was conducted to comply with DMG Rule 4.09.1(11). <br />This inspection was conducted to evaluate: <br />/ A. Stability of fill (quarterly inspection) <br />B. Critical construction periods: <br />~_--_. <br />_l. Removal of all organic materiaUtopsoil <br />2. Placement of underdrainage system <br />• 3. Installation of surface drainage system <br />4. Placement and compaction of fill materials <br />NOTES: <br />file:l:\EN~ENVIRONMENTAI.\EMPIREVNSPREP\WASTEPILEFORM.DOC <br />5. Revegetation <br />