My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP27400
DRMS
>
Back File Migration
>
Report
>
REP27400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:58:20 PM
Creation date
11/27/2007 4:45:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995038
IBM Index Class Name
Report
Doc Date
8/31/1998
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 110C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ ~ ~ III1111111111111111 ~ <br />Notice of Inten 999..c mining Operati <br />110c Construction Materials Annual R Wort <br />Pe rmittee Name: Farmers Construction Inc <br />Permit No. M-95-038 <br />Operation Name: Spor Pit <br />Anniversary Date: October 30, 1998 <br />Sotal: $225.00 (Due on your Anniversary Dat <br />1. a. Permitted acreage: ~J~_ <br />Rec` ~Y7e <br />~k~. ~s ~l <br />RECEIVED <br />SEP 2 .9~~ <br />DIV. OF MINERALS <br />8 GEOLOGY <br />b. County where mine is located: ~~ <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES NO <br />Does this mine operate MORE or LESS than 180 days per year? MORE ESS <br />3. Does this mine have a phased reclamation plan? YES NO <br />4. Total a^.TAF affected during the Leport_Year:* _~_ <br />5. Total acres reclaimed for the report year:* ~,~i~ <br />6. Total number of acres in topsoil replacement stage: /1~n-n~ <br />a. Average thickness of topsoil replaced: ^I <br />7. Total number of acres seeded: ~v r~ <br />a. List species seeded 6 seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: <br />a. Date reclamation began: <br />9. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* <br />10. Estimated total acres to be affected in the next report year:* 0 <br />11. COMMENTS(~: -C h¢ T~v` C~Sa~~C lil .~~ b~ ?r ClQirhe ~I-~p ,.~ <br />`M:.. c ~ fJ UC~• N t~ l .~ c..u `r ~ ~~ r /a ~ l+~ a C /.iG G~'+ ~~*C.~ <br />* Please show the location of the acreage for items 4 - 6 on your map*+. Indicate <br />the phases of the reclamation which have been completed, correlated with your timetable. <br />For phased operations show dates extraction ceased and dates reclamation began. <br />** NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 through <br />6, then a new map is unnecessary. However, this must be stated above. <br />Signature: / / ~ Date: b ~ ~ ~ ~S <br />Please type or print/current contact name, mailing address, and phone number below: <br />Contact Name : ~1QG i 1'~n ~e~r m e r n ./ <br />Company: PAY m¢r ~C ~o, KS~~ `O' 1J1 c• <br />Address : ~~ ~ • ~oX 1 ~~ <br />~rdua~P,CC~. Ss ly s <br />Federal Tax ID No. or Social Security No.: <br />Phone: (x'70 )_~~7-~/_~`6 <br />FAx No : r c~v 13;J 7 -®135® <br />I(.~~f5~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.