<br />ANNUAL REPORT
<br />INSTRUCTIONS
<br />,~,
<br />According to C.R.S. 34-32-I 16(3), and C.R.S. 34-32.5-I 16(3)(a), on the anniversary date of the permit each year,
<br />the operator.shall submit a report and a map showing the extent of current disturbances to affected land.
<br />reclamation accomplished to date and during the preceding year, new disturbances that are anticipated to occur
<br />during the upcoming year, and reclamation that will be performed during the upcoming year. Please attach such
<br />a repon and map to enclosed annual repon Form. (An adequately labeled map that clearly delineates and includes
<br />[he above elements may suffice for a written report.)
<br />[f your operation is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must
<br />provide with the Annual Report the following information as' required by 2 CCR 407-I, 407-4, and Rules
<br />1.13.7(I)(a):
<br />_ ., {i) the-cotulition-of-the operationat-the time of cessation; - - - - - -- - - - --
<br />(ii) what specific measures have been and will be implemented to comply with reclamation, performance
<br />standards and Environmental Protection Plan requirements, if they are pan of your approved application: and
<br />(iii) plans for resumption of mining operations.
<br />Please provide the additional following information with your Annual Report, as applicable:
<br />(a) Per the requirements of 2 CCR 407-I , 407-4, and Rules I.15(1), provide an updated statement
<br />regarding the sufficiency of the value of the Financial Warranty, specifically:
<br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules I.15(1)(a), provide an updated
<br />statement regarding the sufficiency of the value of the financial warranty. Specifically,
<br />irrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage
<br />credit, and first priority liens on project related fixtures.
<br />~~~
<br />(ii) Per the requirements of 2 CCR 407-I, 407-4, and Rules 1.15(1)(b), permits secured with a
<br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified
<br />independent appraiser, indicating any changes in property value, and a statement summarizing
<br />any circumstances which may affect the adequacy of the Deed of Trust, or Security agreement,
<br />an3 th'e value of the property subject [o either of these instruments`The report shall also provide -
<br />proof that there are no past-due property taxes.
<br />(i) Per the requirements of 2 CCR 407-I, 407-4, and Rules 4.7(3), permits secured with an
<br />L-revocable Letter of Credit, the operator shall have the bank provide documentation in the form
<br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the Letter of
<br />Credit does not exceed ten percent (lOno) of the bank's capital surplus accounts.
<br />(ii) Per the requirements of Z CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by a Firn
<br />Priority Lien on any fixtures and Equipment, the operator shall provide a report inskrfficient -••
<br />detail to fully describe the condition, value, and location of all,plet#ged fixtures and bquipment.
<br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(c), all monitoring information
<br />required as pan of the approved permit application, to include the Environmental Protection Plan. (Please
<br />note that if you are not a Designated Mining Operation, you will not have an Environmental Protection
<br />Plan as' part of your approved permit.)
<br />
|