Laserfiche WebLink
mine Monitorin Site TR-A, a e 3 of 3 <br />TR-B, quality ,April -October, Trout Creek (East <br />Rid e) 4.6-140 1, 4-25, Appendix A, Surface Water <br />Monitorin Site TR-B, a e 3 of 3 <br />TR-C, quality, April -October, Trout Creek <br />(Moffat 4.6-140 1, 4-25, Appendix A, Surface Water <br />Monitorin Site TR-C, a e 3 of 3 <br />TR-D, quality, April -October, Trout Creek (below <br />mine 4.6-140 1, 4-25, Appendix A, Surface Water <br />Monitorin Site TR-D, a e 3 of 3 <br /> <br />alluvial ound water <br />TR-1.5, level and quality ,Trout Creek 4.6-140 & 141 1, 26-45, Appendix B, Ground Water <br />Elevations, page 2 of 2; Ground <br />Water Monitoring Site TR-1.5, page <br />3 of 3 <br />TR-3, level and quality, Trout Creek 4.6-140 & 141 1, 26-45, Appendix B, Ground Water <br />Elevations, page 2 of 2; Ground <br />Water Monitoring Site TR-3, page 3 <br />of 3 <br />TR-4, level and quality, Trout Creek 4.6-140 & 141 1, 26-45, Appendix B, Ground Water <br />Elevations, page 2 of 2; Ground <br />Water Monitoring Site TR-4, page 3 <br />of 3 <br />WR-1, level and quality, West Ridge (base) 4.6-141 1, 26-45, Appendix B, Ground Water <br />Elevations, page 2 of 2; Ground <br />Water Monitoring Site WR-1, page 3 <br />of 3 <br /> <br />slo a stabili round water <br />215 W and L, level, Moffat, NW 4.6-145 I, Appendix D, Moffat Area Wells, <br />218W and L, level, Moffat, NE 4.6-145 page 2 of 2 <br />8925 and L, level and ualit ,Moffat, SW 4.6-146 <br /> <br />Trout Creek Sandstone <br />TCS-1 uali , annuall , 3` eriod 4.6-148 49, A endix F <br /> <br />S rin and See Surve <br />Western ed e, West Rid e, Ma or after snow melt 4.6-145 47, A endix C, Exhibit 1 <br />See Table 4.6-54, page 4.6-144 of the PAP for parameters and frequency (partial monthly, April through October, <br />complete 3/year). <br />z TCS-1 on the map Exhibit 4.6-26 and report is listed as TRS-1 on page 4.6-148 of the PAP. <br />Review of Predicted Probable Hydrologic Consequences <br />No direct disturbance of the quantity of water in Trout or Oak Creeks was anticipated to occur (PAP page 2.5-96). <br />Post-mining contributions to flows in Trout and Oak Creeks from the permit area will be unchanged from that which <br />now exists (PAP page 2.5-98). The quantity of water discharged from the mine site after reclamation was predicted <br />to nearly remain unchanged from pre-mining conditions after reestablishment of hydrologic regimes (PAP 4.6-61 a). <br />Such appears to be the case. <br />With regard to the Trout Creek drainage, spring and seep flows increase with snow melt and then taper off, <br />Page 4 <br />