My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP27080
DRMS
>
Back File Migration
>
Report
>
REP27080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:58:05 PM
Creation date
11/27/2007 4:40:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990098
IBM Index Class Name
Report
Doc Date
9/29/1999
Doc Name
ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Notice of Intent to Continue Mining Operations <br />112c Constnlction Materials Annual Report <br />Permitcee Name: Asphalt Paving Company <br />Permit No. M-90-098 <br />Operation Name: Perry Pic <br />Anniversary Dace: September 29, 1999 <br />Toca1: 5550.00 (Due on your Annive rsarv Date) <br />1. a. Permitted acreage: 118 <br /> b. County where mine is located: WELD <br />2. Has this mine been granted TEMPORARY C°_SSATION STATUS? YES ~O <br /> Does this mine operate MOAE or LESS than 180 days per year? ORE Lc55 <br />3• Does this mine have a phased reclamation plan? 'fE5 NO <br />4. Total acres affected during Coe report year:• 2.5 <br />5. Total acr=_s reclaimed Eor the report year:' GRAnFD ONiY <br />5. Total number of acres in topsoil replacement stage: N/A <br /> a. Average thickness of toosoi'_ rep iac ed: <br />7. Total number of acres seeded: N/p <br /> a. List species seeded & seeding race for report year on back <br />8. For nor.-phased operations provide dates extraction ceased: NrA <br /> a. Dace reclamation began: N/A <br />9. The type and approximate quantity of fertilizers, organic material or soil <br /> conditioners used for the report year:' N/A <br />10. Estimated total acres to be affected in the next report year:' 3 - 4 <br />11. COMMENTS: <br />• Please show the location of the acreage for items 4 - 6 on your map••. Indicate <br />the phases of the reclamation which have been completed, correlated with your timetable. <br />For phased operations show dates extraction ceased and dates reclamation began. <br />" !:om°_: If there have not bee.^. any changes since the last arr_ual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 through <br />6, then a rew map is unnecessary. However, th'_s must be seated above. <br />Signature: <br />Dace: SEPTEMBER 29, 1999 <br />Please type or print current contact name, mailing address, and phone number below: <br />Contact Name: JAMES R. KRATTENMAKER phone: 003 ) 279-6611 <br />Company: ASPHALT PAVING CO. F.aSC NO: X303 ~ 279-6216 <br />Address: 14802 WEST 44TH AVENUE <br />. GOLDEN, CO 80403 <br />Federal Tax ID No. or Social Security No.: <br />
The URL can be used to link to this page
Your browser does not support the video tag.