Laserfiche WebLink
~Latlibert aita ~,~~atiate,~ <br />GONSU LTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT <br />PROJECT [DUMBER MB9005tdT DACE Wednesday 5-15-H9 <br />PROJECT NAME West Elk Gob Pile <br />PROJECT LOCATION Sorttmerset <br />CLIENT West Elk <br />CONTRACTOR West Elk Coal Co <br />TECHNICIAN Briggs <br />WEATHER CONDITIONS Sunny <br />WORK REQUESTED Density tests <br />FU REMAN Don DeGraffenried <br />WORK PERFO RILED BY LAMBERT AND ASSOCIATES REPRESENTATIVE (AND REMARKS) <br />I arrived at the project site as requested by t1r. Don DeGraffenried. I performed <br />soil moisture content and soil density tests as requested by Mr. DeGraffenried of <br />material being placed on the gob pile using nuclear soil density test methods. <br />Please refer to the test results sheet for approrimate test locations and test <br />results. The test results indicate only the relative compaction and soil moisture <br />content of the material tested at tlJe elevation and location tested at the time <br />of our site visit. <br />P 0 BO%3966 P.O. 80%OOdS 467 TURNER. 104 A <br />GRAND JUNC TION, CO 81502 MON iROSE. CO B t 402 DURANGO. CO 6 t 301 <br />(303) 2a 56506 (7071 2d 9~ 2 t 54 (307) 259 5095 <br />