Laserfiche WebLink
<br /> REFUSE DISPOSAL SITE CHECK SHEET <br /> ITEM CO?1MENTS <br />1. Coal refuse de osited in 24" lavers X <br />2. Each layer is compacted to at least X ~~ <br /> 907, maximum dr densit <br /> Ditch lined with rock above fill <br />3. V-Ditch D-9 inscalled area - lower area of ditch in <br /> a.iilSlope Y. Variable X haul road. <br /> b. Ditch linin ?faterial <br />4. V-Ditch D-10 installed. ' <br /> a. Slope X Variable X Ditch lined with rock from dam <br /> b. Ditch lining ?faterial t0 fill area. <br />5. Height of refuse material since last X <br /> bench (If 40' CONSTRUCT BENCH!) 40+/- ft. <br />6. Bench being constructed. <br />7. Refuse material outslope is 24° or <br /> 1V: 2'•i H Maximun X <br />8. Bench width is 20 feet X <br />9. Bench slope is back towards refuse pile at ~ ~~~ <br /> 1P: 20 H ?finimum. X Bench under construction. • <br />10. Benches are pitched towards either side to X <br /> divert runoff to ditch D-9 or D-10. <br />11. Completed outslopes and benches are covered <br /> 'with at least 4' of nontoxic, noncombustible <br /> X <br /> material includin an ade ua[e to soil laver. <br />]2. Evidence of anv structural defects.* X * If yes see camoents below <br />13. Topsoil from previously undisturbed areas <br />' bein salva ed ade uatel X <br />14. Trash and other debris being separted <br /> from coal refuse. <br /> • X <br />15. Additional comments or observations <br /> r, <br /> I hereby certify that the inspection of the refuse disposal area vas done under m.• <br />!irect supervision and is constructed as per the current Colorado Mined Land Reclamation <br />'ermit requiremencs.,(for the 2nd quarter of 1982.) <br /> <br /> JUNE 1983 <br />)ate ~ o <br /> S'gnatureo <br /> e e <br />'" <br /> o°°~..o.o"° S <br /> NO P ~'~ <br />