My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP27030
DRMS
>
Back File Migration
>
Report
>
REP27030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:58:03 PM
Creation date
11/27/2007 4:39:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
Report
Doc Date
9/9/1982
Doc Name
986
From
SNOWMASS COAL CO
To
MLR
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r' <br />• <br />REFUSE DISPOSAL SITE CHECK SHEET <br />ITEM VFC •~n ~ ~.. COTfM ENTS~~ .~ ~ .-~ <br />1 refuse de osited in 24" lavers <br />X <br />.... .. .. ..... <br />h layer is compacted to at least .. <br />907. maximum dr densit X <br /> Ditch lined with rock above fil <br />3. v-Ditch D-9 installed area - lower area of ditch in <br />a. Slope ~ Variable haul road <br /> <br />b. Ditch linin *iaterial X . <br /> <br /> <br />4. V-Ditch D-l0 installed _ <br />Ditch lined with rock from dam <br />. <br />a. slope ;[ Variable to fill area. <br /> X <br />b. Ditch lining Tfaterial <br />5. Height of refuse material since last <br />bench (If 40' CONSTRUCT BENCH!) 40 +/- ft_ X <br />6. Bench bein constructed. X <br />7. Refuse material outslope is 24° or ... . <br />_1V: 2'i H Maxiroun X j <br /> -1 <br />8. Bench width is 20 feet ~ X Bench under construction. <br />9. Bench slope is back towards refuse pile at <br />1V• 20 H Afinimum. X Bench under construction. <br />10. Benches are pitched towards either side to <br /> X <br />divert runoff to ditch D-9 or D-10. <br />11. Completed outslopes and benches are covered <br />'with at least 4' of nontoxic, noncombustible X <br />material includin an ade uate to soil laver. <br /> X <br />12. Evidence of anv structural defects.* * If ves see comments below <br />13. Topsoil from previously undisturbed areas X <br />' bein salva ed ade vatel . <br />14. Trash and other debris being separted <br />from coal refuse. X <br />15. Additional comments or observations <br /> <br />,. <br />I hereby certify that the inspection of the refuse disposal area vas done under m}• <br />9r~id-destined Land Reclamation <br />direct supervision and is constructed as per [he current C <br />o <br />Permit requirements , for the 2nd quarter of 1982. ~,,P.~......, St <br />F <br />O <br />~ <br />, <br />0 YE <br />( <br />' <br />S ° ' O- <br />~~ <br />~ <br />~ <br />August 30, 1982 <br />~ <br />Date <br />5 ~na[ a ¢~ <br />~ <br />- <br />.a: [{ <br />St" en Self, P. •'019597 <br />fSS/0 <br />~ E~ <br />Po A <br />
The URL can be used to link to this page
Your browser does not support the video tag.