Laserfiche WebLink
ANNU P T <br />AL RE OR <br />INSTRUCTIONS <br />k <br />According to C.R.S. 34-32-I 16(3), and C.R.S. 34-32.5-I 16(3)(x), on the anniversary date of the permi[ each year, <br />the operator shall submit a report and a map showing the extent of current disturbances to affected land. <br />reclamation accomplished to date and during the preceding year, new disturbances that nre anticipated ro occur <br />during the upcoming year, and reclamation that will be performed Burins the upcoming year. Please attach such <br />a report and map to enclosed annual report form. (An adequately labeled map tha[ cleatly delineates and includes <br />the above elements may suffice for a written report.) <br />If your operation is subject to the provisions of Temporary Cessation as defined in the A.ct and Rules, you must <br />provide with [he Annual Report the following information as required by 3 CCR 407-I, 407-4, and Rules <br />1.13.7(I)(a): - <br />(i) the condition of the operation at the time of cessation; <br />(ii) what specific measures have been and will be implemented to comply with reclamation, performance <br />standards and Environmental Protection Plan requirements, if they are part of your appnrved application; and <br />(iii) plans for resumption of mining operations. <br />Please provide the additional following information with your Annual Report, as applicable: <br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1), provide ari updated statement <br />regarding the sufficiency of the value of the Financial Warranty, specifically; <br />(i) Per the requirements of 2 CCR 407-I, 407-4, and Rules 1.15(1)(x), provide an updated <br />statement regarding the sufficiency of the value of the financial warranri. Specifically, <br />irrevocable letters of credit, Deeds of Trust, and security agreements, se`.f-insurance, salvage <br />credit, and first priority liens on project related fixtures. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.1~(1)(b), permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified <br />independent appraiser, indicating any changes in property value, and a statement summarizing <br />any circumstances which may affect the adequacy of the Deed of Trust, or Security agreement, <br />_ and the v_alue_of the.property s~Pct to eiche~of_theseinstruments. The reporshall also provide -_ <br />proof that there are no past-due property taxes. <br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), pern»ts secured with an <br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form <br />of a balance sheet, certified by a Certified Public Accountant, demonstn.ting that the Letter of <br />Credit does not exceed ten percent (10%) of the bank's capital surplus accounts. <br />(ii) Per the requirements of 2 CCR 407-I, 407-4, and Rules 4.9.3(c), permits secured by a First <br />Priority Lien on any fixtures and Equipment, the operator shall provide :t report in sufficient <br />detail to fully describe the condition, value, and location of all pledged fixtures and equipment. <br />(b) Per the requirements of 2 CCR 407-I, 407-4, and Rules 1.15(I)(c), all moniu>ring information <br />required as part of the approved permit application, to include the Environmental Protection Plan. (Please <br />note that if you are not a Designated Mining Operation, you will not have an Environmental Protection <br />Plan as part of your approved permit.) <br />