Laserfiche WebLink
Rajah 30 Mine Annuat Report <br />November 2005 <br />No mining occurred at the site during the past yeaz. <br />The site was reclaimed during the month of May. <br />In cooperation with the DMG, a bulkhead was constructed in the Rajah 30 adit, and it was <br />completed in December of 2003. Inspections were conducted in 2005 in accordance with the DMG <br />approved bulkhead monitoring plan, and the results of the inspection were sent to the DMG. The <br />DMG approved bulk head monitoring plan has been completed. <br />No new disturbances are expected during the coming year. Umetco will continue to monitor the <br />site surface for stability and vegetative growth. <br />A map is not included because there have been no new disturbances during the past yeaz <br />