Laserfiche WebLink
• overlies the 1st East Mains developed in 1994. This location was measured three <br />~ times for water levels during 1994 and found to exhibit water levels within the <br />normal range previously established for this site. Well DH-600 is also located <br />in the East Roatcap drainage and is located at the end of panel H. This well <br />has a 1,040' long tube in it to measure depth to water. This location was <br />measured three tires for water level during 1994 and the water level was <br />apparently below the tube during all ~ronitoring events. <br />Hydrology monitoring was extended into the northern portion of the East Roatcap <br />Creek drainage during 1993 to accommodate newly acquired lease areas and revised <br />mine plans. Mining during 1994 was confined to the western thick coal pod. <br />Advance mining during 1994 was performed in the 1st East Mains and Panel X. <br />Panel Y was partially pillared and Panel Z was advanced mined and partially <br />pillared during the year. Hydrology monitoring conducted during 1994 did not <br />indicate mine related i~acts were occurring. The majority of monitored <br />locations exhibited characteristics and patterns similar to previously observed <br />data. water quality remains good overall and no physical i~acts have been <br />l._ noted at any of the nunitored locations which would suggest adverse effects <br />associated with mining operations at the Howie No. 1 Mine. <br />• <br />8 <br />