Laserfiche WebLink
~, <br />Knight Resold <br />G G N S V L T I N G <br />Knight Piesolrl and Co. <br />1050 Seventeenth Street, Suite 450 <br />Denver, Colorado 80265-2011 <br />U.S.A. <br />September 8, 2004 <br />For: File <br />Re: Colowyo Coal Company L.P. (C-81-019) <br />West Pit Fill Inspection Report and Certification <br />Second Quarter, 2004 <br />Telephone (303) 629-8788 <br />Telefax (303) 629-8789 <br />VOUfl REFERENCE <br />OUR REFERENCE <br />West Pit Fill Construction Report <br />During the quarter beginning July 2004 and ending September 2004, I inspected the area in <br />which the West Pit Excess Spoil Fill is being constructed. The purpose of these inspections was <br />to inspect the fill surface for vegetative efforts, inspect the fill for areas of water seepage or <br />surface drainage, and satisfy the requirements of CMDG Rule 4.09.1(1 la). <br />During the quarter, no progress was made on the West Pit Fill. No overburden was hauled to <br />backfill in the West Pit due to spoil room constraints. No sloping to final grade occurred. No <br />reclamation seeding was done during the quarter. No seepage was evident in the surface drain or <br />underdrain during the quarter. <br />Attached to this. report is my cerCification that all construction requirements have been met thus <br />far in constructing the West Pit Excess Fill. <br />d~ <br />aye T. Pickarts, P.E. <br />Senior Project Manager <br />xc: Mr. Crellin Scott, Colowyo Coal Company, L.P. <br />West Pit Fill Construction Engineering Report <br />cf 4.5.2 2004 <br />