Laserfiche WebLink
<br />L! <br />Program Plan Description <br /> <br />A) Hollow Stem Auger Drilling_program <br />- Three (3) drill holes each in Upper and Lower tailings ponds to <br />include: <br /> <br />• 1 in deepest portion of tailings mass <br />• 1 in beach area for coarse fraction <br />• 1 in area opposing beach for fine fraction <br />F~ <br />e <br />4 <br />