My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP26798
DRMS
>
Back File Migration
>
Report
>
REP26798
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:57:54 PM
Creation date
11/27/2007 4:34:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Report
Doc Date
3/1/1981
Doc Name
REPORT PRELIMINARY DESIGN RECOMMENDATIONS INITIAL WASTE ROCK PILE MT GUNNISON COAL MINE SOMERSET CO
Permit Index Doc Type
STABILITY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 8 - <br />These parameters are based on the results of tests on <br />"undisturbed" samples which were consolidated prior to shear- <br />ing. The shear strength has been estimated principally from <br />saturated, consolidated, undrained triaxial tests with pore <br />pressure measurements. For consolidated undrained conditions <br />on "undisturbed" samples, the following total stress para- <br />meters are indicated: <br />Soil Typetotal ctotal~ksf) <br />Slightly Sandy Clay 21.5° 0.60 <br />In situ densities at natural moisture content are about <br />125 lb/f t3. <br />We have reviewed the available data and consider that <br />these shear strength parameters are reasonable for the expec <br />foundation materials. <br />3.2 WASTE ROCK COMPOSITION <br />The initial waste rock storage area will be used for <br />storing waste rock from mine development and reject from the <br />rotary breaker. <br />The exact composition of the disposal pile will not be <br />established until mining commences. However, an estimate of <br />the anticipated ranges of material types can be made based on <br />the types of waste material associated with the coal, as de- <br />termined from the exploratory drilling program, and the pro- <br />posed method of mining. <br />The following materials will be the principal constitu- <br />~eoinooo coNw~nerc, iNC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.