Laserfiche WebLink
Review Checklist <br />for Coal Refuse Pile Inspection Report <br />Inspection period(s): 3rd quarter 2002 <br />Mine: FOidet Creek Date review completed: November 26, 2002 <br />CDMG permit no.: C-82-056 CDMG reviewer: Tom Kaldenbacb <br /> Requirement Requirement <br /> <br />Requirement <br />citation ' <br />complied with . <br />Comment <br /> eslno <br /> CDMG regulations <br />1. Inspector was 4.10.2(1) and yes None <br />qualified <br />4.09.1(11)(x) <br />2. Report certified by DMG Policy <br />P E Memorandum of yes None <br /> 7/13/84 <br />3. Inspected during CDMG regulation <br />critical construction 4.10.2(1) and yes None <br />periods 4.09.1(11 (a) <br />4. Inspected at CDMG regulations <br />minimum quarterly 4.09.1(11)(a)and yes None <br />frequency 4.10.2(2)(x) <br />5. Timely submitted CDMG regulation 3 days late, but was of no <br />report to DMG (within 4.09.1(11)(b) yes consequence. <br />two weeks of inspection) <br />6. Conduct of <br />inspection: Observed and 4.10.2(2)(b) yes None <br />and tested to evaluate <br />hazardous conditions <br />7. Content of report: CDMG regulation <br />Described hazardous 4.09.1(11)(b) yes None <br />conditions <br />8. Content of report: <br />Included photographs of CDMG regulation No underdrain being <br />underdrain during and 4.09.1(11)(c) yes constructed. <br />after construction <br />9. Promptly notified <br />DMG and other agencies <br />of potential hazardous 4.10.2(3) yes None <br />conditions found during <br />ins ection <br />cc: Dan Hernandez <br />