Laserfiche WebLink
BTU EMPIRE CORPORATION WASTE PILE INSPECTION FORM <br />PILE LD. NO. 1211-CO-09-01370-01 (SURFACE WASTE PII,E) <br />PII.E LD. NO. 1211-CO-09-01370-02 (OLD NO. 9 EXCAVATION) <br />DATE/TIME: 5 /3~~7 <br />INSPECTOR SIGNATURE: X~ ~ G'. /~.~~- <br />INSPECTOR TITLE: E~Vlran/her,~i~ ~~~/a~~cf <br />Under the supervision of Michael W. Ludlow, Colorado P.E. #24046 <br />This inspection was conducted to comply with DMG Rule 4.09.1(11). <br />This inspection was conducted [o evaluate: <br />Stability of fill (quarterly inspection) <br />B. Critical construction periods: <br />1. Removal of all organic materiaUtopsoil <br />2. Placement of underdrainage system <br />3. Installation of surface drainage system <br />4. Placement and compaction of fill materials <br />5. Revegetation <br />NOTES: <br />filea:\EN\EN V IRONMENTAL\EMPIRE\INSPREP\W ASTEPILEFORM.DOC <br />