Laserfiche WebLink
~, <br />TABLE 21 <br />CULVERT SIZING <br />Culvert <br />Number <br />2(2) <br />3 <br />4 <br />5(3) <br />6 <br />7 <br />8(7) <br />9 <br />10 <br />11 <br />12(7) <br />13 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />23 <br />24 <br />25 <br />27 <br />26 <br />29 <br />30(5) <br />31(6) <br />32(7) <br />33(7) <br />39(7) <br />35(9) <br />36(9) <br />37(9) <br />lOYR - 24 HR <br />Peak Discharge <br />(cF5) <br />210.0 <br />40.6 <br />40.6 <br />174.8 <br />106.9 <br />5. (IO) <br />11.0 (10) <br />12.6 <br />8.7 <br />17.9 <br />27.4 <br />3.5 <br />9:1 (10) <br />1 9 <br />29:1 (10) <br />29.1 (10) <br />56.4 <br />41.5 <br />111.0(8) <br />46.2 <br />157.2(6) <br />147.6 <br />3.9 <br />3.9 <br />60.7 <br />5.3 <br />29.1 (10) <br />10.0 <br />9.2 <br />2.0 <br />4.0 <br />67.0 <br />Ptinimum Culvert(1) <br />Diameter <br />(Inches) <br />60 <br />36 <br />36 <br />60 <br />60 <br />18 <br />2-18 <br />24 <br />24 <br />30 <br />36 <br />18 <br />36 <br />30 <br />36 <br />30 <br />36 <br />46 <br />36 , <br />(4) <br />(4) <br />42 <br />60 <br />12 <br />12 <br />36 <br />18 <br />36 <br />24 <br />24 <br />18 <br />18 <br />36 <br />(1) From "Handbook of Steel Drainage and Highway Construction Products" <br />nomograph with no head on pipe and using E~•7/D Scale No. (3). <br />(2) Sized using 3 ft. of head on pipe (HL4/D = 1.5), HW/D Scale No. (1). <br />(3) Sized using 2 ft of head on pipe (H[•7/D = 1.5), HW/D Scale No. (3). <br />(4) Culverts 23 and 24 are inlet culverts to Culvert 25. Culvert 25 was sized <br />using the Hazen-Plilliams formula Exhibit 19, ~•]est Portal Culvert Data C21 <br />• through C25. <br />(5) Sized using 1.5 head on pipe (H[d/D = 1.5), HW/D Sale No. (1). <br />2.05-14 (Revised 03/23/87) <br />(6) Revised 3-11-68 SDF1 <br />(7) As-Built 3-27-88 SDM <br />(8) Revised 7-20-88 <br />(9) Revised 8-9-88 <br />(10) Revised 2-14-89 for a 100 yr. 24 hr. event on the refuse area south of <br />Hwy 12 <br />