My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP26506
DRMS
>
Back File Migration
>
Report
>
REP26506
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:57:42 PM
Creation date
11/27/2007 4:31:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Report
Doc Date
2/22/1989
Doc Name
NEW ELK MINE PN C-81-012 RESPONSE TO STIPULATION 44 DESIGN FOR THE OLD REFUSE PILE DRAINAGE TO SAFEL
From
WYOMING FUEL CO
To
MLRD
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iuiiiiiiiiuiii <br />999 <br />UJ~oming Fuel Compon~ <br />147 Union Blvd. Suite 400 • P.O. Box 15596 • Lakewood, Colorado 80275 • Telephone (303) 9895037 <br />February 17, 1989 <br />~' ,.. -. <br />Mr. Anthony Waldron _ _:,, <br />Reclamation Specialist ~if~.: ~ l <br />Colorado Mined Land Reclamation Division <br />1313 Sherman Street - -.- -,,, <br />Denver, CO 80203 ~`(._",` ~ " "' - "' <br />Re: New Elk Mine (Permit No. C-81-012); Response to Stipulation <br />No. 44, Design for the Old Refuse Pile Drainage to Safely <br />Pass a 100-Year, 29-Hour Storm Event <br />Dear Mr. Waldron: <br />In response to Stipulation No. 44 of the New Elk permit, <br />revisions to the drainage plan are enclosed for your review. <br />Peak flow into ditches D2, D3 and D4 has been recalculated to <br />safely pass a 100-year, 24-hour storm event on the old refuse <br />pile. Flow into downstream ditches D15 and D22 has also been <br />recalculated to carry the 100-year, 29-hour flow from D4 to Pond <br />007. As shown on Table 20, Ditch Data, ditches D3 and D4 were <br />increased in size from a Type A to a Type B ditch. Ditch D15 was <br />increased in size from a Type B to a Type C ditch. No other <br />changes were required. <br />Revised Table 21, Culvert Sizing, shows the increased flow <br />in culverts 7, 8, 15, 17, 19 and 32. No changes in the culvert <br />sizing were required due to the increased flow. <br />On-the-ground changes to ditches D3, D4 and D15 will be made <br />within 90 days of January 24, 1989 as required in Stipulation <br />No. 44. <br />call. <br />If you have any questions regarding the redesign, please <br />Sincerely, <br />~~ <br />Steve Magnuson <br />Mining Engineer <br />SDM/klk <br />cc: Mike Kolin <br />Jerry Y,oblitz <br />Tom Augustine <br />
The URL can be used to link to this page
Your browser does not support the video tag.